Tuesday, October 12, 2010

Mechanical, Electrical, and Plumbing etc.

Didn't know how to show you that the Internet and Cable was being installed so I took a picture of the boxes.

Plumbing is going in. This is the vanity in the shared bathroom for a double and a single.

This is currently what the circuit breaker box looks like.

Front of the house with bay window finally installed.
The front of the house. Looks amazing already.

The carport because I like it a lot.


Since of scale for the car port. Todd in the back in the light colored shirt is about six feet tall.

Bricks around the house.

Back of the house.

The Back of the house is bricked up.

Brick going up around the house.

On the outside the bricks are going up and the next thing should be the stone and the deck. On the inside the electrical, cable, internet, HVAC, plumbing, and fire suppression are all going in. The house is going just as fast as it was before but it will be hard to see the progress and document. I will keep you posted as much as possible.